Roofers view.

Roof related problems.
Seen thru the eyes of an experienced roofer.
Specialty:preventative maintenance.
Prolong the life of an existing roof.
Visual check,photograph and document roofs and its components to ensure a watertight seal.
Repairs are done on the spot or an assessment is given.
Pictures shown are the most common problems found.
Steep:shingles,slate,spanish and french tile.
Flat:hot tar,modified (smooth,granular),epdm,tpo.
Misc:rain gutters,copper valleys,sheet metal works.
Reflective aluminum coatings (fibered and non fibered)

Sunday, November 27, 2016

multi-unit building roof evaluation and emergency repair

Building manager called us.head engineer was checking the roof and found large openings on the roof's membrane,next to large drain.

Torched down a permanent patch over the affected area,initially the loose portion is fused together.
Primed and sealed.

The roof drain happens to be the lowest point.immediately we checked the rest of the drains and found openings on three more.some more severe than others

Very large roof.heavy rains are expected tonight,this would have been disastrous .one roof drain alone handles massive amounts of water.

Other visible openings were spotted right away a few feet away from another drain

Keyword:Roof maintenance.
Nothig lasts forever

We visually check the entire roof and perimeter.These are small overlooked issues but bound to give you big problems,we will notify the property manager.

We have to comeback in better weather,to prime and paint all these vents the rust will discolor the roofing membrane and potentially start damage.

Wind damage.extra fasteners will be applied on these wind facing wall

Water ponds next to skylight all these seams have to be reinforced because this will turn to ice and split the seams open.this will be covered with snow making it next to impossible to detect

Open seams fused together.primer was applied and a permanent patch torched over it.

The seams around the roofs drains are expected to suffer the most wear and tear.
These need to be probed to make sure they're sound.

Large HVAC unit,the curb was thoroughly checked.another roof drain sits a few feet away.

This one required two patches.we can not stress enough the importance of preventative maintenance.

Different view.notice the granular loss on the existing material due to the large volume of water these drains handle during a heavy downpour like the one expected tonight.Please give us a call for all your roofing needs
We give you peace of mind and wellake sure your roof will be watertight.

It will be pouring tonight,we are glad we got those openings permanently sealed.call us if you are in need of our services.this building manager was pleased with the results and he wont be getting any phone calls from angry tenants

Wednesday, November 23, 2016

large water leak over hallway

Property manager called us with a problem.
It goes without saying. We had to act quickly since rains were expected overnight.

We found a very old and deteriorated flat roof above the end of the hallway

A solution to the problem was decided immediately.
No patches!

A permanent solution.modified bitumen will be torched down over the existing .this happened to be the original roof,only one thin layer of asphalt and tar paper.

Small roof but it hold a a lot of water
The only drain,its the scupper box,located on the corner.
Quite a few small "boxes" or curbs these had to be flashed also to complete the job.time was of the essence.
Since heavy rains were expected overnight

The flashing on the wall its wide open and a downspout from a high roof dumps water on the left (we moved it to have acces to the wall)

Small roof,but time consuming with all the detail work.
New modified has been applied 

New roof its been applied,watertight tonight.
A permanent solution to a long postponed problem.
Property managers dont forget to call us and homeowners as well.

Tuesday, November 22, 2016

Rooftop metal curb for busy restaurant

Business owner called,he had a new metal curb delivered and anchored to the roof.

The new roof top unit was about to be delivered.
And the flashing had to be done asap.


A second metal curb waiting to be installed and flashed as well.

Different view.

Entire surface to be flashed,exterior walls.
Will be primed prior to modified flashing application

Second rooftop unit waiting to be reflashed.



Finished application of smooth modified.



Sheet of plywood was screwed down,it had started to drizzle.

Finished product, this roof will be silver coated next.

Wednesday, November 2, 2016

Roof maintenance and coating application

Supervisor and security system.

Homeowner was worried about the over all condition of her roof,and wants to extend its serviceable life.

Low spots on the roof,water tends to sit and causes extreme.wear and tear.

Several permanent patches were placed on different areas of the roof,mainly over faulty,cracked open seams.these are permanent.as long as they're applied properly by a trained professional.

Deck was pressured washed while onsite,rain was expected.

Siding was removed to apply a waterproofing membrane.

Another areas of concern.this is an old roof ,we applied patches were most needed.
Again.these are permanent and compatible with the existing material.

Special attention was placed on all roof protrusions.
This soil stack pipe was reflashed as seen here.

New siding was installed after a waterprofing membrane was placed on the walls,this will prevent wind driven rain from getting into the stairway area

Pressure washed the deck.before staining and waterproofing also.

Mixing the reflective fibered coating and enjoying the view

Coating being applied by trained professional

All coping stones were sealed at the joints.
This will prevent water from coming in at the top of the parapet walls

All detail work was done and all vents were sealed at the base with urethane based caulk.
Prior to thr coating application.

Patches were applied close to the gutter edge,these were two buildings and two separate roofs owned by the same person

All a/c units were checked to make sure the base was not making any punctures on the roofing membrane.
Extreme vibration will cause damage when the units are not sitting on a plastic base on a mat.

View of a portion of the finished work

This service provided will ensure additional years of use.the keyword.maintenance!

All detail work was done before the remainder of the roof was coated

Like day and night.

Homewner was happy with the final results

Another satisfied customer.
Call us if you want these results.
Pictures speak a thousand words.